Optimal reservoir utilization of pumped hydro storage plants in probabilistic production costing models intended for generation expansion planning / by Antonio Conejo.

Saved in:
Bibliographic Details
Main Author: Conejo, Antonio (Author)
Format: Thesis Book
Language:English
Published: Stockholm, 1990
Series:Trita-EES, 9003
Subjects:

Magasin - måste förbeställas

Holdings details from Magasin - måste förbeställas
Volume Call Number Loan type Availability
pP 2097/9003 Läsesalslån Available Check Hold